Great Northern ballast train
Rate Topic:
- Vice President
-
-
Group:
Status: Elite Member
-
Posts:
2,879
-
Joined:
21-December 14
-
Gender:Male
-
Location:Northeast Oregon
-
Simulator:Microsoft Train Simulator
-
Country:
Posted 29 July 2018 - 02:56 PM
It's summertime, 2 Great Northern Mikados depart Whitefish at 3 AM to take a string of hoppers to the Walton (ballast) Pit. The train rolls through Columbia Falls & passes the plant in Conkelly.
- Vice President
-
-
Group:
Status: First Class
-
Posts:
2,345
-
Joined:
24-March 10
-
Gender:Male
-
Simulator:Open Rails - MSTS
-
Country:
Posted 29 July 2018 - 05:34 PM
Nice.
Great Northern had distinctive wooden 70 ton ballast cars that nobody has modeled. The right shape for them does not exist in MSTS.
Christopher
- Vice President
-
-
Group:
Status: Elite Member
-
Posts:
2,879
-
Joined:
21-December 14
-
Gender:Male
-
Location:Northeast Oregon
-
Simulator:Microsoft Train Simulator
-
Country:
Posted 30 July 2018 - 01:11 PM
The train rolls across the bridge at Citadel (Coram), & passes the station in Belton.
- Vice President
-
-
Group:
Status: Elite Member
-
Posts:
2,879
-
Joined:
21-December 14
-
Gender:Male
-
Location:Northeast Oregon
-
Simulator:Microsoft Train Simulator
-
Country:
Posted 31 July 2018 - 05:23 PM
The train rolls through Red Eagle, & after a little while, backs into the Walton Pits. After the cars are loaded with ballast, the train pulls into the yard at Walton.
- Vice President
-
-
Group:
Status: Elite Member
-
Posts:
2,879
-
Joined:
21-December 14
-
Gender:Male
-
Location:Northeast Oregon
-
Simulator:Microsoft Train Simulator
-
Country:
Posted 01 August 2018 - 07:49 PM
The engines get coaled & watered, followed by turning on the wue & moving the caboose to another track, followed by shoving the consist on the track & couple up to the caboose.
- Vice President
-
-
Group:
Status: Elite Member
-
Posts:
2,879
-
Joined:
21-December 14
-
Gender:Male
-
Location:Northeast Oregon
-
Simulator:Microsoft Train Simulator
-
Country:
Posted 02 August 2018 - 07:46 PM
After inspection & waiting for trains to pass, the train leaves Walton now heading westbound. After a while, the train rolls through Red Eagle. Red Eagle is the site of the start - end of a double track section; the site had a flagstop here along with a wye.
- Vice President
-
-
Group:
Status: Elite Member
-
Posts:
2,879
-
Joined:
21-December 14
-
Gender:Male
-
Location:Northeast Oregon
-
Simulator:Microsoft Train Simulator
-
Country:
Posted 03 August 2018 - 07:39 PM
The train pulls into the siding at Belton & after meeting a freight, gets underway again; after a while, the train rolls over the bridge just around the curve at Citadel.
- Vice President
-
-
Group:
Status: Elite Member
-
Posts:
2,879
-
Joined:
21-December 14
-
Gender:Male
-
Location:Northeast Oregon
-
Simulator:Microsoft Train Simulator
-
Country:
Posted 04 August 2018 - 07:29 PM
The train passes the plant at Conkelly, rolls through Columbia Falls, & ends the trip as it stops on a siding in Whitefish.
1 User(s) are reading this topic
0 members, 1 guests, 0 anonymous users