Posted 03 March 2024 - 05:16 PM
Hello, I have a section with the following characteristics:
A (single track, start of rail)
B (double track, with the same double-direction of traffic on both)
C (single track, two-way traffic)
D (double track, one direction of traffic in each, for train crossing)
I have a path that leaves from "A", crosses "B" with a passing path for both options, crosses through "C" until it reaches the corresponding "D".
The train on path "A-B-C-D" was stuck in "B passing", and the traffic light did not authorize it to enter "C" to go to "D". On the opposite track from "D" there is another train, with the path "D-C-B (same track where the first mentioned train is stopped)".
I thought it could be solved by placing a traffic light with a link to the D-track where the first train should exit, but it is still stuck.
I have, then, the theory that the passing path is not suitable for the timetable mode. Is that so?