Prototype Question - CTC - Protecting industrial spurs.
#1
Posted 09 October 2012 - 08:33 AM
#2
Posted 09 October 2012 - 08:59 AM
If you are talking about an industrial siding beside a mainline sort of thing, the train crew would let the dispatcher know they are stopping to set a car off or lift one but these days if it's on CTC the switch would be wired into the CTC and when they opened it it would change the signals around it.
Industrial parks and spurs are a little different. Movements to and from the industrial sidings would be governed by CTC and a Dispatcher but not while on the industrial siding or spur. The local job in Dartmouth gets clearance from the Halifax Dispatcher to move along the mainline from Dartmouth Yard to Burnside Yard where he leaves the mainline. For hours he switches the Burnside industrial yard on his own without asking the Dispatcher anything until he wants to return to the Dartmouth Yard, then he needs to ask the Dispatcher fir clearance to occupy the main again.
Paul :-)
#3
Posted 09 October 2012 - 10:24 AM
#4
Posted 09 October 2012 - 10:39 AM
What would make sense is eventually the switch would be locked/unlocked as Herb said, above, just to make sure the train crew returned the points to their correct location -- for thru traffic. The question is, I suppose, at what time did railroads feel the need for the extra expense? I'll ask around and see if anything turns up.
#5
Posted 09 October 2012 - 10:49 AM
It seems to be flexible we'll need some configuration options for such switches - ie
- remote controllable - yes/no
- signalled - yes/no
I have heard the term 'unlocking the switch' . Is this something the ground crew does with the padlock. Or is this something that is done by remote control from the dispatcher?
#6
Posted 09 October 2012 - 11:16 AM
wacampbell, on 09 October 2012 - 10:49 AM, said:
Both. You don't want members of the public throwing the switch on the main to excite an otherwise dull day. Locks might not be required on industrial switches off the main (this member of the public remembers throwing a switch on many a dull summer afternoon in my youth; they're heavy).
#7 Inactive_nyc01_*
Posted 09 October 2012 - 11:53 AM
wacampbell, on 09 October 2012 - 08:33 AM, said:
You might find some of you questions answered in a similar discussion here -
http://www.trainsim....tion-for-jjtang
To sum it up the dispatcher does not control other than main track and only has direct control of a control point/interlocking.
As far as a hand throw switch off of main track is concerned, a train (cars with a locomotive or locomotives attached) can not clear up on say an industrial spur unless that hand throw switch has an electric lock. As an example if say a local/industrial job (train) was working a customer off of the main track and needed to get in the clear for other traffic even if that train could entirely clear the main it would not be able to unless that hand operated switch was equipped with an electric lock.
#8
Posted 09 October 2012 - 01:17 PM
The timer, in theory, gives enough time that should there be a train on the main, and it having already passed the nearest signal, it would arrive at the switch prior to you throwing it. If it hasn't passed when the switch is thrown, then the thrown switch will cause a stop or restricting signal, protecting any moving train from your movement.
There may be circuitry to allow the timer to skip to open if the main block is already restrictive (due to your train being on it), but if the main block is clear, the timer is applied.
Like what was mentioned in previous posts, why would you be operating a switch if your train isn't on the main? Some routes have rather short locals, and if the local crew is on a light engine, the engine could clear the main on just about any industrial siding. So if they ran out of their hours for whatever reason, they'd tie up the engine at any industry, and the taxi pick them up. When the next crew arrived, the main would need to be protected when they went to leave the siding.
James
#9
Posted 09 October 2012 - 01:42 PM
Doug
#10 Inactive_nyc01_*
Posted 09 October 2012 - 03:05 PM
inflammable, on 09 October 2012 - 01:17 PM, said:
James
A light engine isn't going to clear up on any industrial siding unless it is equipped with an electric lock. Hand throw switches off the main line without electric locks actually have to be left open until the crew is done at that particular location.
A train that is already occupying a main track does not have to get permission to enter other than main track. It's only if that train has cleared the main track (at an electric lock switch) that the train will have to obviously get permission to re-enter the main track.
Exceptions to this as an example would be in the case of say a running track where the train would have to get verbal permission from the designated employee in charge to occupy that running track.