Elvas Tower: Pacific Electric in Watts - Elvas Tower

Jump to content

  • 7 Pages +
  • 1
  • 2
  • 3
  • Last »
  • You cannot start a new topic
  • You cannot reply to this topic

Pacific Electric in Watts Rate Topic: -----

#1 User is offline   Pery Scope 

  • Fireman
  • Group: Status: Active Member
  • Posts: 118
  • Joined: 12-March 08
  • Gender:Male
  • Location:Leipzig, Saxony, Germany
  • Simulator:MSTS, ORTS
  • Country:

Posted 19 April 2016 - 09:52 AM

Here are some pics from my Pacific Elctric Route.

Currently, the tracks of the route from L.A. to Watts are finished. The landscape is still under construction. Extensions to San Pedro and Long Beach are planned. (And later even the Western District, but that is yet future).

Attached Image: PE_02.jpg

Attached Image: PE_03.jpg

Attached Image: PE_06.jpg

Attached Image: PE_07.jpg

Attached Image: PE_08.jpg

Attached Image: PE_09.jpg

Best wishes
Pery Scope

#2 User is offline   JackWhiteIII 

  • Apprentice
  • Group: Status: Inactive
  • Posts: 39
  • Joined: 06-August 13
  • Gender:Male
  • Simulator:MSTS
  • Country:

Posted 19 April 2016 - 10:42 AM

Very cool.

#3 User is offline   atsf37l 

  • Executive Vice President
  • Group: Status: First Class
  • Posts: 4,642
  • Joined: 25-February 05
  • Gender:Male
  • Location:San Diego
  • Simulator:ORTS
  • Country:

Posted 19 April 2016 - 12:02 PM

Nicely done, P.E.Ry! Tim Muir's wonderful equipment sure looks nice there. Keep us posted on your progress, please. :bigboss:

#4 User is offline   Mike B 

  • Superintendant
  • Group: Status: Elite Member
  • Posts: 1,085
  • Joined: 18-January 13
  • Gender:Not Telling
  • Location:Pacific Time
  • Simulator:Mostly ORTS these days
  • Country:

Posted 19 April 2016 - 06:23 PM

Considering how much of the old PE line through Watts is now the LA Metro Blue Line, it might be interesting to do an alternative-scenery version (AFTER getting the current one in hand of course!!) that's modern. Most likely, many tracks would be removed (though there's a UP (SP) freight line paralleling the Blue Line for much of its length so something might be possible switching-wise). And I don't think there are many modern LRV models that could be easily adapted. Anyway, great job!

Hmmm. Wonder if LA Metro might fund development of a Blue Line route and possibly the Expo line (Air Line) to Santa Monica too? Would be an interesting addition to their web site, like CP did with a partial version of a MLT route at one time.

#5 User is offline   Pery Scope 

  • Fireman
  • Group: Status: Active Member
  • Posts: 118
  • Joined: 12-March 08
  • Gender:Male
  • Location:Leipzig, Saxony, Germany
  • Simulator:MSTS, ORTS
  • Country:

Posted 23 April 2016 - 05:20 AM

Hello dear friends

I am glad that you liked the pictures. Therefore, there is soon a few more pictures from the currently available state of the track.
The overpass over the Firestone Blvd., Graham Yard and Slauson Jct.

Best wishes
Pery Scope

#6 User is offline   atsf37l 

  • Executive Vice President
  • Group: Status: First Class
  • Posts: 4,642
  • Joined: 25-February 05
  • Gender:Male
  • Location:San Diego
  • Simulator:ORTS
  • Country:

Posted 23 April 2016 - 12:00 PM

Can't wait!

#7 User is offline   delamate 

  • Fireman
  • Group: Status: R.I.P. or just Retired
  • Posts: 112
  • Joined: 21-February 05
  • Gender:Male
  • Country:

Posted 25 April 2016 - 09:23 AM

View PostPery Scope, on 19 April 2016 - 09:52 AM, said:

Here are some pics from my Pacific Elctric Route.

Currently, the tracks of the route from L.A. to Watts are finished. The landscape is still under construction. Extensions to San Pedro and Long Beach are planned. (And later even the Western District, but that is yet future).

Attachment PE_02.jpg

Attachment PE_03.jpg

Attachment PE_06.jpg

Attachment PE_07.jpg

Attachment PE_08.jpg

Attachment PE_09.jpg

Best wishes
Pery Scope

Very nice! I look forward to continuing progress on this route.

John DeLamater

#8 User is offline   Pery Scope 

  • Fireman
  • Group: Status: Active Member
  • Posts: 118
  • Joined: 12-March 08
  • Gender:Male
  • Location:Leipzig, Saxony, Germany
  • Simulator:MSTS, ORTS
  • Country:

Posted 26 April 2016 - 07:56 AM

Hello dear friends

here some news of the construction ...

Attached Image: PE_23.jpg
A train of Watts Local Line crosses the Firestone Blvd.

Attached Image: PE_25.jpg
In the background of Graham Yard. Since I unfortunately was not enough information about this marshalling yard, I had to be a bit creative.

Between Watts and Slauson Jct.
Attached Image: PE_22.jpg

Attached Image: PE_21.jpg

Attached Image: PE_20.jpg

Slauson Jct. is still under construction. On the right you see the turnoff of Yorba Linda Whittier Line. There are also here to find little information, it is not built by me (for now).
Attached Image: PE_19.jpg

So much for today

Best wishes
Pery Scope

#9 User is offline   Pery Scope 

  • Fireman
  • Group: Status: Active Member
  • Posts: 118
  • Joined: 12-March 08
  • Gender:Male
  • Location:Leipzig, Saxony, Germany
  • Simulator:MSTS, ORTS
  • Country:

Posted 14 October 2016 - 08:52 AM

Hello friends,

After a long time there are new advances to show the route. The other end of the line in the city of L.A. is ready.

Attached Image: pe_112.jpg
In the 8th Street Yard there is a train with Portlend Twelves to the Main Street Station

Attached Image: pe_110.jpg
In the background the striking gasometer (thanks to Tim Muir)

Attached Image: pe_108.jpg
En route on the Olympic Boulevard

Attached Image: pe_107.jpg
Olympic Boluevard corner San Pedro Street. At the back is a PCC of the LATL. Note the triple rail.

Attached Image: pe_104.jpg
Entrance to the elevated railway viaduct

Attached Image: pe_102.jpg
The Main Street Station with the Pacific Electric Building

Attached Image: pe_100.jpg
Still Hollywood Cars drive on the Watts Local Line. But on the right, the buses are ready to be replaced soon

More pictures of the route to Watts coming soon
Pery Scope

#10 User is offline   delamate 

  • Fireman
  • Group: Status: R.I.P. or just Retired
  • Posts: 112
  • Joined: 21-February 05
  • Gender:Male
  • Country:

Posted 17 October 2016 - 08:48 AM

View PostPery Scope, on 14 October 2016 - 08:52 AM, said:

Hello friends,

After a long time there are new advances to show the route. The other end of the line in the city of L.A. is ready.

Attachment pe_112.jpg
In the 8th Street Yard there is a train with Portlend Twelves to the Main Street Station

Attachment pe_110.jpg
In the background the striking gasometer (thanks to Tim Muir)

Attachment pe_108.jpg
En route on the Olympic Boulevard

Attachment pe_107.jpg
Olympic Boluevard corner San Pedro Street. At the back is a PCC of the LATL. Note the triple rail.

Attachment pe_104.jpg
Entrance to the elevated railway viaduct

Attachment pe_102.jpg
The Main Street Station with the Pacific Electric Building

Attachment pe_100.jpg
Still Hollywood Cars drive on the Watts Local Line. But on the right, the buses are ready to be replaced soon

More pictures of the route to Watts coming soon
Pery Scope




Beautiful work! I really love your attention to details that is evident in the screenshots. Having spent some childhood years in LA in the 1950s, I recognized several locations from just the screenshots, no need for captions! I am really looking forward to running this route.

John DeLamater

  • 7 Pages +
  • 1
  • 2
  • 3
  • Last »
  • You cannot start a new topic
  • You cannot reply to this topic

1 User(s) are reading this topic
0 members, 1 guests, 0 anonymous users