Looking at the Trello board, some of the requests have already been included in OR v1.5. These include:
Future
#47 - cruise control is now possible, (further work ongoing?)
#290 - there is now SFX for small ejector and large ejector
Unsorted
#260 - blowdown is now possible
#419 - large ejector control is included in OR
#449 - tender capacity can now be specified in tender wag file
#485 - problems with graduated release are now resolved
#486 - brake pipe overcharge is possible
#490 - vacuum release valve works with bleed off command now
#521 - broken water scoop is already a feature
#527 - twin pipe triple valve behaviour is now correct for older emu stock and push pull trains
Also noted in unsorted:
#368 - is factually untrue as the two tanks are always connected by a balance pipe.
#517 - is a list of unrelated suggestions and probably needs to be split up!
Page 1 of 1
Trello Board
#2
Posted 14 February 2024 - 10:58 AM
#3
Posted 23 February 2024 - 12:03 PM
Page 1 of 1