Elvas Tower: Silverton in September - Elvas Tower

Jump to content

Page 1 of 1
  • You cannot start a new topic
  • You cannot reply to this topic

Silverton in September Rate Topic: -----

#1 User is offline   motor1 

  • Vice President
  • Group: Status: Elite Member
  • Posts: 2,879
  • Joined: 21-December 14
  • Gender:Male
  • Location:Northeast Oregon
  • Simulator:Microsoft Train Simulator
  • Country:

Posted 29 November 2023 - 07:57 PM

(This is the 2nd of 3 stories on the Rio Grande narrow gauge on September 19th, 1937).

We now move to Durango. The Silverton, with K-27 #459, departs Durango at 8:45 AM with 8 loads 6 empties.

Crew: Conductor Duxstadt, and Engineer Hauck.

Consist: 1 mdse Silverton, 1 lumber Silverton, 1 coal Silverton, 1 ties Silverton, 1 ties Elk Park, 1 ties Needleton, 1 machinery, 2 empty box, 3 empty double decks Silverton, combine 202, and a caboose.

Attached Image: Open Rails 2023-05-07 09-14-33.jpg

Attached Image: Open Rails 2023-05-07 09-27-10.jpg

The train stops at Trimble...

Attached Image: Open Rails 2023-05-07 09-31-25.jpg

... and at Hermosa a short while later.

Attached Image: Open Rails 2023-05-07 09-34-15.jpg

#2 User is offline   motor1 

  • Vice President
  • Group: Status: Elite Member
  • Posts: 2,879
  • Joined: 21-December 14
  • Gender:Male
  • Location:Northeast Oregon
  • Simulator:Microsoft Train Simulator
  • Country:

Posted 30 November 2023 - 03:09 PM

The train climbs Hermosa Hill...

Attached Image: Open Rails 2023-05-07 09-38-42.jpg

... makes a stop at Rockwood...

Attached Image: Open Rails 2023-05-07 09-42-47.jpg

... and traverses the High Line.

Attached Image: Open Rails 2023-05-07 09-44-09.jpg

Attached Image: Open Rails 2023-05-07 09-46-03.jpg

#3 User is offline   motor1 

  • Vice President
  • Group: Status: Elite Member
  • Posts: 2,879
  • Joined: 21-December 14
  • Gender:Male
  • Location:Northeast Oregon
  • Simulator:Microsoft Train Simulator
  • Country:

Posted 01 December 2023 - 01:22 PM

The train rolls over the Animas...

Attached Image: Open Rails 2023-05-07 09-47-25.jpg

... makes a stop at Tacoma...

Attached Image: Open Rails 2023-05-07 09-49-05.jpg

... takes on water at Cascade Creek Tank...

Attached Image: Open Rails 2023-05-07 09-53-24.jpg

... and rolls over the Animas again at Tefft.

Attached Image: Open Rails 2023-05-07 09-57-05.jpg

#4 User is offline   motor1 

  • Vice President
  • Group: Status: Elite Member
  • Posts: 2,879
  • Joined: 21-December 14
  • Gender:Male
  • Location:Northeast Oregon
  • Simulator:Microsoft Train Simulator
  • Country:

Posted 01 December 2023 - 07:41 PM

As the train climbs the hill...

Attached Image: Open Rails 2023-05-07 10-00-12.jpg

Attached Image: Open Rails 2023-05-07 10-02-00.jpg

... the car of ties is set out at the siding at Needleton...

Attached Image: Open Rails 2023-05-07 10-05-04.jpg

... and takes on water at the tank.

Attached Image: Open Rails 2023-05-07 10-07-44.jpg

Attached Image: Open Rails 2023-05-07 10-10-11.jpg

#5 User is offline   motor1 

  • Vice President
  • Group: Status: Elite Member
  • Posts: 2,879
  • Joined: 21-December 14
  • Gender:Male
  • Location:Northeast Oregon
  • Simulator:Microsoft Train Simulator
  • Country:

Posted 02 December 2023 - 02:29 PM

The train rolls over the bridge at Elk Park...

Attached Image: Open Rails 2023-05-07 10-13-30.jpg

... sets out the load of ties at the Elk Park siding...

Attached Image: Open Rails 2023-05-07 10-16-07.jpg

Attached Image: Open Rails 2023-05-07 10-19-29.jpg

... and pulls into Silverton at 1:10 PM with 6 loads 5 empties.

Attached Image: Open Rails 2023-05-07 10-22-59.jpg

#6 User is offline   motor1 

  • Vice President
  • Group: Status: Elite Member
  • Posts: 2,879
  • Joined: 21-December 14
  • Gender:Male
  • Location:Northeast Oregon
  • Simulator:Microsoft Train Simulator
  • Country:

Posted 02 December 2023 - 07:42 PM

After 50 minutesfor the crew to eat, switching, 2 hours load 13 cars sheep, and 25 minutes billing, the train departs Silverton at 4:25 PM with 20 loads, 1 empty..

Consist: 4 ore, 1 mdse Durango, 1 mdse east, 13 cars sheep, Combine 202, and a caboose.

Attached Image: Open Rails 2023-05-07 11-30-00.jpg

Attached Image: Open Rails 2023-05-07 11-33-59.jpg

Attached Image: Open Rails 2023-05-07 11-38-22.jpg

Soon, the train rolls over the bridge at Elk Park.

Attached Image: Open Rails 2023-05-07 11-41-47.jpg

#7 User is offline   motor1 

  • Vice President
  • Group: Status: Elite Member
  • Posts: 2,879
  • Joined: 21-December 14
  • Gender:Male
  • Location:Northeast Oregon
  • Simulator:Microsoft Train Simulator
  • Country:

Posted 03 December 2023 - 02:23 PM

As the train rolls downhill...

Attached Image: Open Rails 2023-05-07 11-45-51.jpg

... it takes on water at the tank at Needleton...

Attached Image: Open Rails 2023-05-07 11-50-02.jpg

... rolls over the bridge at Tefft...

Attached Image: Open Rails 2023-05-07 12-00-28.jpg

... and makes a stop at Tacoma.

Attached Image: Open Rails 2023-05-07 12-14-53.jpg

#8 User is offline   motor1 

  • Vice President
  • Group: Status: Elite Member
  • Posts: 2,879
  • Joined: 21-December 14
  • Gender:Male
  • Location:Northeast Oregon
  • Simulator:Microsoft Train Simulator
  • Country:

Posted 03 December 2023 - 07:45 PM

The train rolls over the High Bridge...

Attached Image: Open Rails 2023-05-07 12-18-51.jpg

... and traverses the High Line.

Attached Image: Open Rails 2023-05-07 12-20-09.jpg

Attached Image: Open Rails 2023-05-07 12-21-37.jpg

Attached Image: Open Rails 2023-05-07 12-22-34.jpg

#9 User is offline   motor1 

  • Vice President
  • Group: Status: Elite Member
  • Posts: 2,879
  • Joined: 21-December 14
  • Gender:Male
  • Location:Northeast Oregon
  • Simulator:Microsoft Train Simulator
  • Country:

Posted 04 December 2023 - 08:35 AM

The train makes a stop at Rockwood...

Attached Image: Open Rails 2023-05-07 12-24-09.jpg

... rolls down Hermosa Hill...

Attached Image: Open Rails 2023-05-07 12-30-07.jpg

Attached Image: Open Rails 2023-05-07 12-33-08.jpg

... and makes a nother stop at Hermosa.

Attached Image: Open Rails 2023-05-07 12-45-07.jpg

#10 User is offline   motor1 

  • Vice President
  • Group: Status: Elite Member
  • Posts: 2,879
  • Joined: 21-December 14
  • Gender:Male
  • Location:Northeast Oregon
  • Simulator:Microsoft Train Simulator
  • Country:

Posted 04 December 2023 - 07:11 PM

The train stops at Trimble...

Attached Image: Open Rails 2023-05-07 12-48-33.jpg

Attached Image: Open Rails 2023-05-07 12-51-52.jpg

... rolls over the 15th street bridge...

Attached Image: Open Rails 2023-05-07 01-10-09.jpg

...and stops at the depot at 8:15 PM with 20 loads, 1 empty.

Attached Image: Open Rails 2023-05-07 01-19-34.jpg

Page 1 of 1
  • You cannot start a new topic
  • You cannot reply to this topic

1 User(s) are reading this topic
0 members, 1 guests, 0 anonymous users