Elvas Tower: Chama extra 453 west - Elvas Tower

Jump to content

  • 2 Pages +
  • 1
  • 2
  • You cannot start a new topic
  • You cannot reply to this topic

Chama extra 453 west Rate Topic: -----

#1 User is offline   motor1 

  • Vice President
  • Group: Status: Elite Member
  • Posts: 2,879
  • Joined: 21-December 14
  • Gender:Male
  • Location:Northeast Oregon
  • Simulator:Microsoft Train Simulator
  • Country:

Posted 09 August 2023 - 03:15 PM

It's September 30, 1944, K-27 #453 depart Chama at 3:50 AM with 15 loads, 29 empties.

Crew: Conductor Murray, and Engineer Johnson. They have been on duty since 12:15 AM, and spent 3 hours 35 minutes switching, loading 12 cars cattle for east bound movement, and air inspection.

Attached Image: Open Rails 2023-07-10 09-35-35.jpg

Attached Image: Open Rails 2023-07-10 09-39-18.jpg

Attached Image: Open Rails 2023-07-10 09-42-51.jpg

Soon, the train pulls up to the siding at Azotea to meet Durango Extra 481 east that left Durango the day prior).

Attached Image: Open Rails 2023-07-10 09-46-45.jpg

#2 User is offline   motor1 

  • Vice President
  • Group: Status: Elite Member
  • Posts: 2,879
  • Joined: 21-December 14
  • Gender:Male
  • Location:Northeast Oregon
  • Simulator:Microsoft Train Simulator
  • Country:

Posted 09 August 2023 - 07:51 PM

After 2 hours of waiting and performing a saw by, the west bound freight continues it's way west.

Attached Image: Open Rails 2023-07-10 03-13-19.jpg

Attached Image: Open Rails 2023-07-10 03-22-06.jpg

Attached Image: Open Rails 2023-07-10 03-26-22.jpg

Soon, it pulls into Monero to do some switching.

Attached Image: Open Rails 2023-07-11 02-16-38.jpg

#3 User is offline   motor1 

  • Vice President
  • Group: Status: Elite Member
  • Posts: 2,879
  • Joined: 21-December 14
  • Gender:Male
  • Location:Northeast Oregon
  • Simulator:Microsoft Train Simulator
  • Country:

Posted 10 August 2023 - 12:37 PM

After 35 minutes switching and doing some merchandise work, the train gets underway.

Attached Image: Open Rails 2023-07-14 01-30-56.jpg

Attached Image: Open Rails 2023-07-14 01-36-00.jpg

Soon the train makes a stop in Lumberton.

Attached Image: Open Rails 2023-07-14 01-40-06.jpg

After 10 minutes merchandise work, the train stops at Dulce to do some switching.

Attached Image: Open Rails 2023-07-14 01-44-55.jpg

#4 User is offline   motor1 

  • Vice President
  • Group: Status: Elite Member
  • Posts: 2,879
  • Joined: 21-December 14
  • Gender:Male
  • Location:Northeast Oregon
  • Simulator:Microsoft Train Simulator
  • Country:

Posted 10 August 2023 - 07:21 PM

After 15 minutes of merchandise work and switching, the train gets underway again.

Attached Image: Open Rails 2023-07-14 01-53-00.jpg

The train rolls through Navajo.

Attached Image: Open Rails 2023-07-14 01-56-25.jpg

Attached Image: Open Rails 2023-07-14 01-58-00.jpg

Attached Image: Open Rails 2023-07-14 01-59-49.jpg

#5 User is offline   motor1 

  • Vice President
  • Group: Status: Elite Member
  • Posts: 2,879
  • Joined: 21-December 14
  • Gender:Male
  • Location:Northeast Oregon
  • Simulator:Microsoft Train Simulator
  • Country:

Posted 11 August 2023 - 08:57 AM

The train follows the river as it heads west.

Attached Image: Open Rails 2023-07-14 02-00-59.jpg

The train rolls over bridge 387.67...

Attached Image: Open Rails 2023-07-14 02-02-52.jpg

... and makes a stop at Gato.

Attached Image: Open Rails 2023-07-14 02-05-26.jpg

After 25 minutes eat, merchandise and water, the train gets underway,

Attached Image: Open Rails 2023-07-14 02-07-22.jpg

#6 User is offline   motor1 

  • Vice President
  • Group: Status: Elite Member
  • Posts: 2,879
  • Joined: 21-December 14
  • Gender:Male
  • Location:Northeast Oregon
  • Simulator:Microsoft Train Simulator
  • Country:

Posted 11 August 2023 - 06:46 PM

The train soon stops at Carracas for a pick up.

Attached Image: Open Rails 2023-07-14 02-09-40.jpg

5 minutes later, the pick up is complete and the train gets underway once more.

Attached Image: Open Rails 2023-07-14 02-15-29.jpg

Attached Image: Open Rails 2023-07-14 02-17-14.jpg

Soon it rolls through Arboles.

Attached Image: Open Rails 2023-07-14 02-19-23.jpg

#7 User is offline   motor1 

  • Vice President
  • Group: Status: Elite Member
  • Posts: 2,879
  • Joined: 21-December 14
  • Gender:Male
  • Location:Northeast Oregon
  • Simulator:Microsoft Train Simulator
  • Country:

Posted 12 August 2023 - 09:40 AM

As the train begins to climb...

Attached Image: Open Rails 2023-07-14 02-20-40.jpg

Attached Image: Open Rails 2023-07-14 02-24-05.jpg

... it rolls through Allison...

Attached Image: Open Rails 2023-07-14 02-26-21.jpg

... and Tiffany.

Attached Image: Open Rails 2023-07-14 02-27-56.jpg

#8 User is offline   motor1 

  • Vice President
  • Group: Status: Elite Member
  • Posts: 2,879
  • Joined: 21-December 14
  • Gender:Male
  • Location:Northeast Oregon
  • Simulator:Microsoft Train Simulator
  • Country:

Posted 12 August 2023 - 07:03 PM

As the train continues heading west...

Attached Image: Open Rails 2023-07-14 02-29-04.jpg

... it rolls through La Boca.

Attached Image: Open Rails 2023-07-14 02-30-57.jpg

Attached Image: Open Rails 2023-07-14 02-31-55.jpg

Attached Image: Open Rails 2023-07-14 02-33-51.jpg

#9 User is offline   motor1 

  • Vice President
  • Group: Status: Elite Member
  • Posts: 2,879
  • Joined: 21-December 14
  • Gender:Male
  • Location:Northeast Oregon
  • Simulator:Microsoft Train Simulator
  • Country:

Posted 13 August 2023 - 07:23 AM

The train makes a stop in Ignacio to do some switching.

Attached Image: Open Rails 2023-07-14 02-36-16.jpg

After 35 minutes switching and having a meet with the eastbound San Juan, the train gets underway.

Attached Image: Open Rails 2023-07-14 02-45-07.jpg

Attached Image: Open Rails 2023-07-14 02-46-29.jpg

Attached Image: Open Rails 2023-07-14 02-47-55.jpg

#10 User is offline   motor1 

  • Vice President
  • Group: Status: Elite Member
  • Posts: 2,879
  • Joined: 21-December 14
  • Gender:Male
  • Location:Northeast Oregon
  • Simulator:Microsoft Train Simulator
  • Country:

Posted 13 August 2023 - 07:25 PM

As the train rolls past various fields...

Attached Image: Open Rails 2023-07-14 02-49-20.jpg

... it rolls through Florida.

Attached Image: Open Rails 2023-07-14 02-52-06.jpg

Attached Image: Open Rails 2023-07-14 02-53-50.jpg

After cresting the top of Falfa Hill, the train rolls downhill.

Attached Image: Open Rails 2023-07-14 02-55-31.jpg

  • 2 Pages +
  • 1
  • 2
  • You cannot start a new topic
  • You cannot reply to this topic

1 User(s) are reading this topic
0 members, 1 guests, 0 anonymous users