Following wagons on hump yard operation
#11
Posted 28 August 2021 - 02:34 AM
http://users.atw.hu/...on/balaton.html
Correction:Inbound-Tranzit Park
#12
Posted 28 August 2021 - 04:50 AM
alifatico, on 28 August 2021 - 12:30 AM, said:
Thank you
It's the nice Rübelandbahn, that you can download from here
https://www.treinpun...a=view;down=546
or here
http://www.freeway-g...229c5085e7241f8
It requires a mini-route installation, and includes rolling stock and activities.
#13
Posted 28 August 2021 - 07:17 AM
Weter, on 28 August 2021 - 02:34 AM, said:
http://users.atw.hu/...on/balaton.html
SS.jpg
Correction:Inbound-Tranzit Park
Hello Weter
That rolling hill (we call it that) is not real. The track builder is not a railwayman, so he could not have known that there was a 50-thousandth slope from the top of the Hill to the switches. The switches lie on a slope of 15 per thousand. The directional tracks where the cars arrive are on an ascent of 2-3 per thousand. This is called a blocking slope by track professionals.
Thousands: 1000m: 1m slope or ascent. That is, at a length of 1000 meters, the level difference is 1 meter.
Laci 1959
#14
Posted 28 August 2021 - 08:00 AM
Csantucci, on 28 August 2021 - 04:50 AM, said:
https://www.treinpun...a=view;down=546
or here
http://www.freeway-g...229c5085e7241f8
It requires a mini-route installation, and includes rolling stock and activities.
A lot of Thanks
Pedro
#15
Posted 28 August 2021 - 11:15 AM
We are trying to make center of station tracks below level of both bottle throats too.
That gives two benefits:
It keeps consist's buffers compressed, so it's easier for locomotive to start heavy trains;
And, of course, it prevents cars from escape from station tracks to stretch.
Then, please tell me about Gyekenies station: the slope there (at kihuzo towards Croatian border) is not real too?
#16
Posted 28 August 2021 - 12:09 PM
#17
Posted 28 August 2021 - 12:16 PM
So I have seen that sloped kihuzo there.
Looks like semi-hill for rolling.
#18
Posted 22 October 2021 - 08:47 AM
When I release the car from the Hump Yard it is braked and does not descend.
Some solution ?
Best Regards
Pedro
#19
Posted 22 October 2021 - 11:42 AM
#20
Posted 22 October 2021 - 12:40 PM
This will open BCs to atmosphere, so brakes will be released for coasting after decoupling.
Just as in real-life operations at sorting hills.
Bur we have no wagon retarders, or speed managers with their brake-shoes at the downhill park, so cars will not be stopped on storing tracks.
Hence, cars will run away from park then.