CN train 507 spends it's day working around the Halifax area. In the evening it works out of Rockingham Yard west on the Bedford Sub to Kinsac and return. I added 2.6 miles to what I had of the Bedford Sub to included Kinsac and complete the activity.
CN Train 507, westbound past Moir's Pond.
https://images2.imgbox.com/4f/1e/GmUyWAkl_o.jpg
After spotting two tankcars at Procor, the crew leaves most of their train in DF-06 and takes the empty flats to Kinsac.
https://images2.imgbox.com/94/ee/6jYQbTri_o.jpg
The crew leaves their train in the pocket between the siding and mainline switches, runs around the passing siding, then lisfts the loads and replaces them with empties before heading back to Windsor Junction.
https://images2.imgbox.com/93/b8/dRBBnbx3_o.jpg
Eaastbound crossing Fall River Road.
https://images2.imgbox.com/9d/12/bw50iiiz_o.jpg
Lifting the cars left behind in DF-06.
https://images2.imgbox.com/7c/e0/bPxQ9F6J_o.jpg
507 exchanges tankcars at Municipal Spraying.
https://images2.imgbox.com/01/34/Bm80iZAA_o.jpg
1308 completes the switching at the Bedford Quarry.
https://images2.imgbox.com/12/35/wRypgnNy_o.jpg
Last of the daylight and last car to lift off DF-40 in Bedford.
https://images2.imgbox.com/dd/d5/UGcOGdqy_o.jpg
Paul :-)
Page 1 of 1
CN 507 on the Bedford Sub
#2
Posted 14 June 2020 - 12:39 PM
Great series of shots Paul. The route is looking better and better.
#4
Posted 14 June 2020 - 03:41 PM
Down to three of four activities to write and run.
Paul :-)
Paul :-)
Page 1 of 1