Elvas Tower: Merging of timetables doesn't work correctly - Elvas Tower

Jump to content

Page 1 of 1
  • You cannot start a new topic
  • You cannot reply to this topic

Merging of timetables doesn't work correctly Rate Topic: -----

#1 User is offline   Hannes44 

  • Fireman
  • Group: Status: Active Member
  • Posts: 161
  • Joined: 10-October 17
  • Gender:Male
  • Location:Select State/Province
  • Simulator:Open Rails
  • Country:

Posted 08 January 2019 - 01:11 AM

I'm using timetables a lot, I prefer them to activities, but there is a bug when merging timetables. When I add some new stations to a route and create a timetable with these new stations, the stations get interspersed with the original stations after the merge but the times stay fixed in their cells, they are obviously not linked to their related stations, so most stopping times are attributed to the wrong stations.

#2 User is offline   Buttercup 

  • Conductor
  • Group: Status: Contributing Member
  • Posts: 426
  • Joined: 24-July 08
  • Gender:Male
  • Country:

Posted 08 January 2019 - 03:37 PM

I think the rows of the two timetables that are being merged need to be identical You will have to add rows for the added stations to both timetables.

Page 1 of 1
  • You cannot start a new topic
  • You cannot reply to this topic

1 User(s) are reading this topic
0 members, 1 guests, 0 anonymous users