I was wondering if anyone is successfully running activities on the Powder River Basin in OR? I have been trying to figure out the signalling system without success. I put in a bug report but was told in language I didn't understand that essentially the signal system is messed up, which I already knew. I contacted the author a good while back about the problem which he acknowledged but said he was unable to get repaired? I hate to throw this route out and was hoping someone may have a working copy I could get a copy of. I have been working on the sigscr file for about 2 weeks making changes without success. Can someone with time please help me with these problem?
AJ
Attached File(s)
-
OpenRailsLog.txt (204.14K)
Number of downloads: 233