The train rolls through Kezar as it nears Gunnison.
Shavano in April
#12
Posted 23 May 2018 - 07:03 PM
The train pulls into Gunnison at 7:05 PM.
Epilogue: after 20 minutes switching, the Shavano got underway with 3 baggage cars added, an swing brakeman (.Straitiff), a new engine (K-37 #492) & a new engineer (Saunders). The train lost time during the run ( 7 cars, slow track, snow, doubling to Marshall Pass, and the 492 itself), but the train reached Salida at 11:55 PM.
Epilogue: after 20 minutes switching, the Shavano got underway with 3 baggage cars added, an swing brakeman (.Straitiff), a new engine (K-37 #492) & a new engineer (Saunders). The train lost time during the run ( 7 cars, slow track, snow, doubling to Marshall Pass, and the 492 itself), but the train reached Salida at 11:55 PM.