Goku, on 18 December 2017 - 08:19 AM, said:
previous quote:Goku, on 15 December 2017 - 06:39 AM, said:".......snip...................TSRE should handle track editing tr vector even if there are interactives on it. File size doesn't matter."[end previous quote]
[and todays quote]
No! You can't edit track section with interactive on it. You must to delete them first.
I was talking about tdb line and that is different thing. Tdb line contains many track sections.
Also if you remove junction with linked signals from tdb using Z, the signal links will be broken.
[and todays quote]
No! You can't edit track section with interactive on it. You must to delete them first.
I was talking about tdb line and that is different thing. Tdb line contains many track sections.
Also if you remove junction with linked signals from tdb using Z, the signal links will be broken.
These two quotes from your posts seem to be at odds. Editing Tr vector means to me editing track.
Either I can or cannot edit a route that has interactives installed? Which is it?
regards,
vince